Define the application
Record the actual surface, condition, water exposure and accessible details. Establish whether the enquiry concerns new construction or repair, and provide available drawings and inspection records.
Agree the system and responsibilities
The proposed work should identify the selected SR or SF materials, preparation, joint and penetration details, inspection, testing and protection. Any warranty and specialist responsibilities must be confirmed in writing.
Read the full service guidance
See the relevant waterproofing service and the inspection checklist. Discuss your actual property with Aamtron.
